logo-promatrix.png

VW Up

Promatrix has produced the first prototypes for the front and back bumpers for the VW Up.

The client for this project is SPG-Arkk. Despite the size of these parts, the lead time is just eight weeks. Given their large size, our 1,300 ton injection moulding machine was fitted with a dynamic mould frame. This mould frame ensures that the mould is able to withstand the forces applicable.